Project: I-CAVS   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:paolo cavosi   -  
Project:   Vans - RV-10
Total Hours:2429.2
Total Flight Time:
Start/Last Date:May 28, 2019 - No Finish Date
Engine:IO-540 Thunderbolt Serial # EL-38135-48E
Propeller:MT Propeller MTV-12-B/193-53 serial 22G1268-K
Panel:Garmin G3X
 
Friendly URL: https://eaabuilderslog.org?s=I-CAVS

Home or Last Project Picture

Oct 10, 2023     firewall Insulation - (3 hours) Category: Firewall
Cleaned the firewall and the fiberfrax halves. Final trimming of the fiberfrax halves. Positioned the right half and glued to the firewall. Positioned the left half and trimmed. Used spray glue to position the left fiberfrax. Lucio drilled holes for the oil recess fiberfrax angles after checking proper fitting. Deburred holes.
 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.